
| Process | Assessment guideline (in Dutch) |
|---|---|
| Application of zinc/copper roof, external wall and gutter constructions - Design and construction guidelines for zinc and/or copper roof, external wall and gutter constructions |
|
|
Completion building activities |
BRL 9600
|
|
Roofing on sloping roofs |
BRL 1513 |
| Advice on energy performance | BRL 9500 |
| Procedure for measuring vibration | BRL 5023 |
| Conducting a preliminary building inspection | BRL 5024 |
| Assembling PVC façade elements, door and window frames, doors and windows | BRL 0709 |
| Mounting solar units on buildings | BRL 9933 |
| Spraying with polyurethane foam system - Spraying the underneath of ground-floor Applying cavity wall insulation with mineral wool floors with polyurethane foam |
|
| Paving | BRL 9334 |
| Thermal insulation (or post-insulation) of existing cavity walls - Applying cavity wall insulation with PS-foam beads - Applying cavity wall insulation with mineral wool - Applying cavity wall insulation with UF foam - Applying cavity wall insulation with PUR foam |
BRL 2110 URL 28-101 URL 28-102 URL 28-103 URL 28-104 |
| Applying spec. preserv. technical concrete constructions, carrying out concrete repairs | BRL 3201 part 1 and 2 Assessment guidelines |
|
Building with bricks and glued constructions /pointing |
BRL 2826 URL 0357 URL 0358 URL 0359 URL 0475 URL 20-101 URL 40.01 |
| Tiling | BRL 1017 |
A process certificate guarantees that products have been correctly assembled. It is issued to assembly plants with proven expertise and assembly quality. Like a product certificate, a process certificate gives a prior guarantee of the quality that will be provided. A process certificate is particularly useful if the assembly work has a major impact on the performance of the final product, or if monitoring the implementation requires specialist knowledge. Process certificates can help with building management and reduce the failure costs by preventing mistakes during the process.
No assessment guideline (BRL) available for your process? Please contact us. SKG-IKOB can set up a supervisory committee with representatives of the relevant market parties to devise a new BRL. Once the new BRL has been approved by the Board of Experts, your process can be tested and certified.
Contact
T +31 (0)88-2440100
info@skgikob.nl
Visiting address
Poppenbouwing 56
4191 NZ Geldermalsen
Mailing address
Postbus 202
4190 CE Geldermalsen
Follow us on Twitter
Follow us on LinkedIn